Full refit with marble-effect wallboards
WhitecrookDated tiling and worn flooring replaced with waterproof wallboards, new bath, basin and vinyl floor.
Before
AfterRecent work
Every one of these bathrooms was stripped back and finished by our own team, usually inside two to three days.
Dated tiling and worn flooring replaced with waterproof wallboards, new bath, basin and vinyl floor.
Before
AfterOld gold-framed shower and dated tiling replaced with a black-framed enclosure, marble tiling and wall-hung vanity.
Before
After